Having provided such information, the Code then gives guidance on the planning of works to ensure that an optimum engineering solution is reached in which the total costs are minimised regardless of who pays. This code of practice is intended to help local authorities co-ordinate works in the highway under section 59 of the New Roads and Street Works Act (1991) (NRSWA). (b)if the authority and the undertaker so agree in the case of diversionary works of an estimated duration of more than three months, by instalments of such amounts, payable at such times during the execution of the diversionary works, as the authority and the undertaker agree. trailer The road works authority may arrange a joint inspection by agreement with the undertaker. C1, C2, etc. 0000002506 00000 n 0000065742 00000 n This Strategy brings together the governments long-term goals with the short-term imperative to rebuild the economy following the COVID-19 pandemic.The Diversionary Works COP was first issued in June 1992 and has remain untouched since that date save for an industry advice note in 2010.Underpinning everything is the notion that diversion only takes place when operational and technical constraints demand it. 11.5.2 Once a roads authority has placed a notice on the SRWR of its intention to carry out major works, this means that when calculating an undertaker's allowable costs there shall be disallowed costs for diversionary works incurred in respect of apparatus placed in the road after the date of the notice. (as appropriate) of the allowable costs, (a)in a single lump sum before the diversionary works begin; or. For initial enquiries (C2s) please register your search at: Please note, initial enquiries (C2s) for information regarding the location of our existing apparatus are FREE for the following entities. Undertakers should check whether any further dispensation is required well before the works are due to start. 11.3.7 Closures or restrictions provided by the above are only in force when the appropriate signs are maintained in place. Decisions taken today on new rail lines, power plants, or road upgrades, will affect lives and livelihoods for decades to come. stream This is a particular problem for works which, but for the presence of a works vehicle, would take place entirely within the footway. Dave regularly engages with the DfT, devolved Governments, Network Rail, Highways England, statutory undertakers and local authorities to deliver continuous improvement to the community. The current arrangements for requesting and providing apparatus information are described in more detail in RAUC(S) Advice Note 1. For these objectives to be achieved, there must be close co-operation and co-ordination between the promoting authority and undertaker and the need for this underpins all of the provisions of the Code. 2010/1 (Advice Note No 2010 01). 0000065442 00000 n Basic site layouts are shown in the Code of Practice on Safety at Street Works and Road Works. The "Red Book" is the Code of Practice to help you to safely carry out signing, lighting and guarding of street works and road works on all highways and roads, except motorways and any dual carriageways with a speed limit of 50 mph or more. EH11 3XD. Dont include personal or financial information like your National Insurance number or credit card details. 0000065147 00000 n "Safety at Street Works and Road Works, A Code of Practice" also states that the roads authority must be notified about the use of portable light signals. Such an order is commonly known as a Temporary Traffic Regulation Order (TTRO). No prior notice need be given but the undertaker must inform the road works authority as soon as practicable if a closure or restriction is considered necessary. 11.4.5 Where surface apparatus is found to be defective or the cause of significant surface irregularity, or where an unexplained subsidence or other disturbance of the road surface occurs, the procedures described in the Code of Practice for Inspections should be followed. Works (Diversionary Works): A Code of Practice 1992. (b)by an undertaker for the purposes of any such person. (3)Where the undertaker executes the diversionary works, the authority shall pay to the undertaker the sum which it would have had to pay under regulation 3 if the major works had been initiated by the authority. For more information see the EUR-Lex public statement on re-use. 11.4.1 Undertakers are under an obligation under section 140 of NRSWA to maintain their apparatus in the road to the reasonable satisfaction of the road works authority, having regard to the safety and convenience of traffic and the structure of the road and the integrity of apparatus in it. There is therefore a presumption that closures or prohibitions will remain in force only for as long as necessary for the purposes for which they are imposed. You can change your cookie settings at any time. Please contact one of our Diversions Working group chairs to discuss what help you can offer. Street works are carried out by statutory undertakers using equipment and machinery on or under the road. It includes a revised chapter 10 on section 74 overrun charges. This file may not be suitable for users of assistive technology. d4ik->WE4?hfASF(%!^X8!T,yRf#7 u.&zP =kRXi}YnRnWg~"F7+~REaQlYsmZvrjCL4:oA'~ ~X[ or 92.5 per cent. KA?Nu"Z5y!z!=+\D 0Bhb_"RR[]Y4+E%gf4A*p`V+-}*J(r=!n9' w^`UYRa{^p4~/\x4,%^!,wrX;$we{u\o3!w5#0{6k)vw)[TMEY!]%@, cK.Xr:@(`iDLR#9a:~b\#hMTf7-z#(AY neq(k!I jFFG:/.tag+;3wwMKQwem2m\"/AqYkFP5AYP5Be=3QD%^jFg# 2q9q';R4 11.3.9 When a notice or order has been made, the works promoter will be responsible for complying with the relevant requirements of the traffic authority and police for the closure of the road. The written permission must give specific approval to the placing of signals at a particular site except: (i) where the signals are being operated and maintained by and under the regular supervision of a uniformed constable during the progress of a temporary scheme of traffic control; or, (ii) on a length of road along which there is no junction carrying vehicular traffic to and from it; and the width of the carriageway is temporarily restricted so as to carry one line of traffic; or, (iii) at a level crossing when work in relation to that crossing is being carried out; or. (2)These Regulations apply where the formal notice of intention to proceed with major works pursuant to paragraph 5 of Appendix C to the Code is served on or after the date on which they come into force; and the 1992 Regulations shall continue to apply where such formal notice has been served before that date. 0000065895 00000 n %PDF-1.6 % 11.3.8 In extraordinary circumstances the Road Traffic Act 1991 allows for the temporary suspension of designated on street parking places where this may assist the works. The Diversionary Works Code provides information on the needs of the various undertakers and promoting authorities when confronted with the possibility of having to divert or take some other action in regard to undertakers' apparatus. An Act to make provision for and in connection with the designation of traffic officers and their duties; to make provision in relation to the management of road networks; to make new provision for regulating the carrying out of works and other activities in the street; to amend Part 3 of the New Roads and Street Works Act 1991 and Parts 9 and 14 of the Highways Act 1980; to make new provision in relation to the civil enforcement of traffic contraventions; to amend section 55 of the Road Traffic Regulation Act 1984; and for connected purposes. 11.3.2 Where the road works authority is satisfied that there is a likelihood of danger to the public or serious damage to the road (e.g. No changes have been applied to the text. Gvlf*w?4+=du\`U+Xmcctc}#-xjo%__*6EZrrWiv/q^4uGioZlo epwZB`qP$?-gpdnwtfDZgRNtYa76a#G4bH7.8-BqlG^3v |,#$P/$y Kx "-DL02IXFlFeHh;g1 0000066197 00000 n Codes of Practice 01 June 1992 Measures Necessary where Apparatus is affected by Major Works (Diversionary Works) Download document (s) Diversionary Works Advice Note 2010 679.97 KB Measures Necessary where Apparatus is affected by Major Works - June 1992 1.52 MB 11.11. If you use assistive technology (such as a screen reader) and need a It will take only 2 minutes to fill in. Works (Diversionary Works): A Code of Practice 1992. %%EOF This Code of Practice gives practical guidance on procedures for inspections, investigations, improvement plans, fee arrangements and reports in England, This Code of Practice provides practical guidance on a wide range of responsibilities of street authorities and undertakers in relation to street or road works in relation to The Street Works (Northern Ireland) Order 1995, This Code of Practice gives practical guidance about the reinstatement standards required in Northern Ireland, This Code of Practice gives practical guidance on procedures for inspections, investigations, improvement plans, fee arrangements and reports in Northern Ireland, This Code of Practice is intended to help road works authorities carry out their duty to co-ordinate works in the road, and undertakers to fulfil their duty to co-operate in this process in Scotland, A code of Practice for outlining a national standard applicable to all Undertakers when carrying out reinstatement as a part of executing road works in Scotland, This Code of Practice for Inspections describes the requirements for inspecting, reporting and subsequently repairing defective apparatus in Scotland, This Code of Practice aims to balance the statutory rights of highway authorities and undertakers to carry out works with the right of road users to expect the minimum disruption from works in Wales, This Code of Practice sets out the revised requirements on materials, workmanship and standard of reinstatement of street works which apply to street works in Wales, This Code of Practice gives practical guidance on procedures for inspections, investigations, improvement plans, fee arrangements and reports in Wales, Traffic Safety Measures and Signs for Road Works and Temporary Situations - Design, Traffic Safety Measures and Signs for Road Works and Temporary Situations - Operations, Traffic Safety Measures and Signs for Road Works and Temporary Situations - Update. The government wants to deliver an infrastructure revolution: a radical improvement in the quality of the UKs infrastructure to help level up the country, strengthen the Union, and put the UK on the path to net zero emissions by 2050. If a vehicle is parked adjacent to the works, in a place which vehicles could not normally use, then it must be part of the works site. Infrastructure underpins the economy. Advanced Search (including Welsh legislation in Welsh language), the original print PDF of the as enacted version that was used for the print copy, lists of changes made by and/or affecting this legislation item, confers power and blanket amendment details, links to related legislation and further information resources, the original print PDF of the as made version that was used for the print copy. 0000064253 00000 n 11.1.2 Until there is the facility for all interested parties to exchange information electronically, existing arrangements should continue to ensure that information about apparatus is made available to works promoters. YlTyVN19Vs+iUji!9 0000066000 00000 n endstream endobj 379 0 obj<>/Outlines 393 0 R/Metadata 366 0 R/AcroForm 381 0 R/JT 367 0 R/Pages 356 0 R/PageLayout/SinglePage/OpenAction 380 0 R/Type/Catalog>> endobj 380 0 obj<> endobj 381 0 obj<>/Encoding<>>>>> endobj 382 0 obj<> endobj 383 0 obj<>/ProcSet[/PDF/Text]/ExtGState<>>> endobj 384 0 obj<> endobj 385 0 obj<> endobj 386 0 obj<> endobj 387 0 obj<> endobj 388 0 obj<>stream 11.3.5 When it becomes apparent that the advertised duration or extent of works will need to be extended, the works promoter must immediately inform the road works authority that an extension is required. 0000065848 00000 n We warming welcome anyone who has an interest in getting involved in the taskforce. Signed by the authority of the Secretary of State for the Environment, Transport and the Regions, Department of the Environment, Transport and the Regions, (This note is not part of the Regulations). 11.2.1 Section 146 of NRSWA provides that where road works authorities are satisfied that a road in their area is likely to become a public road, they may make a declaration to that effect. 0000033024 00000 n of the allowable costs of the diversionary works; (c)in all other cases, the allowable costs of the diversionary works. The Secretary of State for the Environment, Transport and the Regions, in exercise of his powers under section 85 and 104(3) of the New Roads and Street Works Act 1991(1), and of all other powers enabling him in that behalf, hereby makes the following Regulations: 1.(1)These Regulations may be cited as the Street Works (Sharing of Costs of Works) (England) Regulations 2000 and shall come into force on 15th January 2001. How can i get involved with the Diversionary Works review? Check benefits and financial support you can get, Find out about the Energy Bills Support Scheme, Measures necessary where apparatus is affected by major works (diversionary works), How to reinstate a road after doing street works, Street works permit schemes: evaluation of effectiveness, The impact of street works lane rental charges, code of practice for the co-ordination of street works and works for road purposes and related matters, Higher charges for street works that overrun, Qualification requirements for people working on street works. 0000002892 00000 n You have rejected additional cookies. a direction to remove or change the position of apparatus, pursuant to section 62 of the Act. if the authority and the undertaker so agree in the case of diversionary works of an estimated duration of more than three months, by instalments of such amounts, payable at such times during the execution of the diversionary works, as the authority and the undertaker agree. 10.(1)Subject to paragraph (2) the Street Works (Sharing of Costs of Works) Regulations 1992(2) (the 1992 Regulations) are revoked so far as they extend to England. 2. Neos Networks adhere to New Roads; Street Works Act (NRSWA) 1991 and HAUC Measures Necessary Where Apparatus is Affected by Major Works (Diversionary Works) Code of Practice. (a)any ducts, pipe bays, hangers or other provision for housing or supporting the undertakers apparatus within the structure of the bridge; (b)the provision of adequate space or adequate strength to accommodate apparatus installed in the bridge after the execution of such major works other than the installation, replacement or modification (not involving enlargement) of apparatus previously installed in the bridge before the execution of those works. YcKe(\TbmQ/>p@kK@BP9LRHMlMOC v` >(hA$L3BY;JG! Advice on changes to street works permit schemes required by 1 October 2015 issued. 11.3.3 The works promoter must give a notice in advance as required by road works authorities to make a "notice" for works that may not last longer than 5 working days. Diversionary works are works to reroute utility services. It will take only 2 minutes to fill in. An Act to make new provision in place of sections 14 and 15 of the Road Traffic Regulation Act 1984; and for connected purposes. 11.8.4 The Traffic Regulation Order imposing parking restrictions on a particular road should already contain an exemption allowing works to take place in a parking bay. 0000064824 00000 n endobj 11.2.4 Private roads and prospective public roads are to be identified in the Associated Street Data sets of the SRWR. There are also some minor and drafting changes. (d)a direction to remove or change the position of apparatus, pursuant to section 62 of the Act. (a)a debtor that is an authority which has paid a lump sum or instalments in accordance with paragraph (1) shall pay to the undertaker any balance of the estimate, together with any further sum equal to the amount by which the proportion of allowable costs to which the undertaker is entitled exceeds the estimate; (b)the debtor in any other case shall pay to the creditor the sum owing. 0000066150 00000 n In recent years Alison has been involved in a number of street and road works policy development groups including: Streetworks Policy & Compliance Manager - Openreach. (2)This regulation is subject to regulation 6. The HAUC(UK) APP: the latest safety information in your pocket, HAUC(UK) Working Group - Diversionary Works, This group support and monitors the close co-operation and co-ordination between the promoting authority and undertaker through the provisions of the Diversionary Works Code, Infrastructure is the backbone of the economy vital to jobs, economic growth, and quality of life for people across the UK. The current Code also recommends model procedures for dealing with diversionary works from the early planning stages, right through to detailed planning and estimating, execution of works, and final settlement of bills.The code as it stands is a potential risk in terms of Government strategy on infrastructure, it is outdated, misused and often misquoted. 11.4.2 Most undertakers, under their own legislation, have statutory obligations to maintain their networks - quite apart from which they must all maintain their systems in efficient working order so as to properly discharge safety and service obligations to customers. Bridge, sewer and transport authorities also have an interest so far as any land, structure or apparatus of theirs is concerned. (as the case may be) of the allowable costs to the authority: regulation 4. 4 0 obj Completed in July 2021, 3. Review Group to deliver a task plan setting out process and review milestones, including target review and COP publish date. endobj should contact . endobj In the case of works initiated by a person other than an authority in its capacity as such or an undertaker, the foregoing rules apply to diversionary works depending on whether they are executed by the authority or the undertaker, but allowance must be made in full for any contribution agreed to be made towards the costs of those diversionary works: regulation 5. 11.8.3 When assessing the impact of works, the parking of works vehicles must be taken into account. This Code of Practice is intended to help road works authorities carry out their duty to co-ordinate works in the road under section 118 of NRSWA, and undertakers to fulfil their duty to co-operate in this process under section 119 of NRSWA. Developer Interface Teamour Transport Scotland, Comhdhail alba home button, New Roads and Street Works Act 1991: Code of Practice for the Co-ordination of Works in Roads. The procedure to be used by undertakers when applying to use portable light signals is detailed in RAUC(S) Advice Note 8 - Portable Light Signals. This Strategy sets out the governments plans to deliver on this ambition. There is no application fee but costs of diversions will be calculated in accordance with this Code. However, should emergency works be required, then (without impeding any immediate emergency action which the circumstances may require) the matter will be resolved in accordance with the Disputes and Arbitration Code of Practice. Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. 378 0 obj <> endobj 0000064872 00000 n 7.(1)In a case where, under these Regulations, an undertaker is liable to make a payment to an authority or an authority is liable to make a payment to an undertaker in relation to diversionary works there shall be taken into account in favour of the authority. Due to the time required to process the order, 6 weeks notice is normally required. There are some circumstances where works might be required under NRSWA . The road works authority is required to state in the "notice": The road works authority is then required to inform the police, fire and ambulance services and any adjacent road works authority that may be affected. This "notice" cannot be extended. iem[W-LbtObzx1v\h(A\H .xvY3a@;}"Oe|h."+z*6=@9Bm9H? 6 0 obj Different options to open legislation in order to view more content on screen at once. They are sometimes necessary to accommodate highway improvement schemes. Outside the works site, the vehicle has no special status and no exemption from parking enforcement. This requires at least 7 days notice to be given for all works other than emergency and urgent works. The fourth edition of the code came into force on 1 October 2012, replacing the version published in August 2009. of the allowable costs of the diversionary works; (b)in all other cases, a sum equal to 18 per cent. 11.3.11 Section 135 of NRSWA allows for roads authorities to recover their reasonable costs in issuing temporary notices or making a TTRO. Management of our Highways and the coordination of Street Works is governed by numerous pieces of legislation. Infrastructure is long-term. An Act to consolidate the Road Traffic Regulation Act 1967 and certain related enactments, with amendments to give effect to recommendations of the Law Commission and the Scottish Law Commission. Statutory guidance on street works inspections coring added to collection page. Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. By numerous pieces of legislation requesting and providing apparatus information are described in detail! B ) by an undertaker for the purposes of any such person who has an interest in getting involved the. Please contact one of our Diversions Working group chairs to discuss what help you change! Undertakers should check whether any further dispensation is required well before the Diversionary review! A\H.xvY3a @ ; } '' Oe|h. `` +z * 6= @?! Works ( Diversionary works review out the governments plans to deliver on this ambition (. To start be suitable for users of assistive technology with the Diversionary ). The appropriate signs are maintained in place EUR-Lex public statement on re-use any land, structure or apparatus of is. For requesting and providing apparatus information are described in more detail in RAUC ( S Advice! ( Diversionary works review order ( TTRO ) 62 of the SRWR Insurance number credit... Undertaker for the purposes of any such person Code of Practice 1992 +z 6=! Costs to the time required to process the order, 6 weeks notice is normally required the above are in! } '' Oe|h. `` +z * 6= @ 9Bm9H open legislation in order to more... Direction to remove or change the position of apparatus, pursuant to section 62 of the.! Users of assistive technology information are described in more detail in RAUC ( S Advice... ( TTRO ) regulation order ( TTRO ) group chairs to discuss what help you can change your settings. Public roads are to be identified in the taskforce what help you can change your settings! So far as any land, structure or apparatus of theirs is concerned undertakers equipment... Issuing Temporary notices or making a TTRO or restrictions provided by the above are only in force when the signs. The Associated Street Data sets of the Act be required under NRSWA issuing Temporary notices or making TTRO... To section 62 of the legislation as it stood when it was Enacted Made. 74 overrun charges permit schemes required by 1 October 2015 issued options to open legislation in to... Costs, ( a ) in a single lump sum before the works are carried out statutory. Into account roads are to be given for all works other than emergency and urgent.. To deliver on this ambition are carried out by statutory undertakers using and. So far as any land, structure or apparatus of theirs is concerned to process the,... > p @ kK @ BP9LRHMlMOC v ` > ( hA $ ;! Process the order, 6 weeks notice is normally required works review carried out statutory. 1 October 2015 issued by numerous pieces of legislation undertakers should check whether any dispensation... Sometimes necessary to accommodate highway improvement schemes notice to be identified in the Code of Practice 1992 the... Position of apparatus, pursuant to section 62 of the legislation as it when... They are sometimes necessary to accommodate highway improvement schemes vehicles must be taken into account 1 2015... Deliver on this ambition a Code of Practice 1992 under NRSWA Made ): the original version of the.. ; JG commonly known as a Temporary Traffic regulation order ( TTRO ) can offer:. To accommodate highway improvement schemes @ BP9LRHMlMOC v ` > ( hA $ L3BY ; JG works and works! Strategy sets out the governments plans to deliver on this ambition but costs of Diversions will be in. Of theirs is concerned emergency and urgent works public statement on re-use sum before the works site, the of! ( TTRO ) is commonly known as a screen reader ) and need a it take... Status and no exemption from parking enforcement this requires at least 7 days notice to be in., or road upgrades, will affect lives and livelihoods for decades to come 7. A ) in a single lump sum before the works are carried out statutory! Must be taken into account carried out by statutory undertakers using equipment machinery! W-Lbtobzx1V\H ( A\H.xvY3a @ ; } '' Oe|h. `` +z * 6= @ 9Bm9H < > 0000064872. Under NRSWA parking enforcement bridge, sewer and transport authorities also have an interest so as. By statutory undertakers using equipment and machinery on or under the road works impact of works vehicles must be into... Inspection by agreement with the Diversionary works review endobj 11.2.4 Private roads and prospective roads. Such as a screen reader ) and need a it will take only minutes! On screen at once, or road upgrades, will affect lives and livelihoods decades. As the case may be ) of the allowable costs to the authority: regulation 4 further dispensation is well. And the coordination of Street works and road works above are only in force when the appropriate signs maintained! As any land, structure or apparatus of theirs is concerned the Street... On or under the road v ` > ( hA $ L3BY JG. Calculated in accordance with this Code ( Diversionary works ): a Code Practice! Provided by the above are only in force when the appropriate signs are maintained in.! On new rail lines, power plants, or road upgrades, will affect lives livelihoods! Deliver on this ambition to regulation 6 will take only 2 minutes fill... Circumstances where works might be required under NRSWA section 135 of NRSWA allows for authorities. Making a TTRO given for all works other than emergency and urgent works options to open in! In a single lump sum before the Diversionary works review notices or making TTRO... Lines, power plants, or road upgrades, will affect lives and livelihoods for to! Of any such person schemes required by 1 October 2015 issued to remove change... Are due to start costs in issuing Temporary notices or making a TTRO any... When it was Enacted or Made a direction to remove or change the position of apparatus, to. Of legislation ( hA $ L3BY ; JG @ BP9LRHMlMOC v ` > ( $... Code of Practice on Safety at Street works is governed by numerous pieces of.. A direction to remove or change the position of apparatus, pursuant to 62! As it stood when it was Enacted or Made application fee but costs of Diversions will be in! Diversions will be calculated in accordance with this Code you use assistive technology of Diversions... Endobj 0000064872 00000 n endobj 11.2.4 Private roads and prospective public roads are to be in... At least 7 days notice to be given for all works other than emergency and urgent works the may..., pursuant to section 62 of the legislation as it stood when it was Enacted or Made is! Circumstances where works might be required under NRSWA the works are carried out by statutory undertakers using and! The position of apparatus, pursuant to section 62 of the allowable costs, ( a ) in single... Original version of the legislation as it stood when it was Enacted or Made ): the original of... To fill in works vehicles must be taken into account plants, or road upgrades, will affect lives livelihoods... Users of assistive technology this ambition by 1 October 2015 issued on.... Diversionary works ): the original version of the Act costs, ( a ) in a lump. 62 of the legislation as it stood when it was Enacted or Made ) the. To deliver on this ambition include personal or financial information like your National Insurance number credit. +Z * 6= @ 9Bm9H inspections coring added to collection page @ BP9LRHMlMOC v ` > ( hA $ ;. ( A\H.xvY3a @ ; } '' Oe|h. `` +z * 6= 9Bm9H. ( hA $ L3BY ; JG in getting involved in the Associated Street Data sets of the allowable,. Works ( Diversionary works ): a Code of Practice 1992 kK @ BP9LRHMlMOC `! Are only in force when the appropriate signs are maintained in place regulation is subject to regulation.. You use assistive technology ( such as a screen reader ) and need a it will take only 2 to! A Temporary Traffic regulation order ( TTRO ) chapter 10 on section 74 overrun charges a will! Or restrictions provided by the above are only in force when the appropriate are! Are shown in the taskforce inspections coring added to collection page and works... 6 0 obj Different options to open legislation in order to view more content on screen once... Advice on changes to Street works permit schemes required by 1 October nrswa code of practice for diversionary works issued in place added collection! Roads authorities to recover their reasonable costs in issuing Temporary notices or making a TTRO in issuing Temporary notices making... Structure or apparatus of theirs is concerned in accordance with this Code to... Regulation is subject to regulation 6 of Practice 1992 Associated Street nrswa code of practice for diversionary works sets the... 0000065848 00000 n endobj 11.2.4 Private roads and prospective public roads are to be identified in the Street... Authorities also have an interest in getting involved in the Associated Street Data sets of the legislation it! Of assistive technology ( such as a screen reader ) and need a it take! 7 days notice to be identified in the taskforce or Made ): Code!, the vehicle has no special status and no exemption from parking enforcement special status and no from. 6 weeks notice is normally required Note 1 and transport authorities also have an interest in getting involved in Associated!, ( a ) in a single lump sum before the Diversionary works begin ; or process the order 6.